READING CYCLE
BILECO, like other electric distribution utilities, maintains a Billing Cycle with the objective to provide accurate and timely billing of kilowatt-hour consumed by its member-consumers. BILECO implements the read and bill scheme following the schedule below:All Connection Type except BAPA and Big Load Customers
– Reading Period is 11 days which starts every 20th of the month. The Reading is done simultaneously in all districts.
Big Loads
– on the 26th of the month
BAPA
– on the 18th of the month
READING & BILLING PROCESS
The Reading/Billing Verifier downloads the list of member-consumers per route to the PSION (a meter reading gadget) on a daily basis throughout the 11-day Reading Period. Then the Meter Readers read the kilowatt-hour meters, print the power bill and distribute it right away to the consumers. At the end of the day, the read data is uploaded and generated to the system. A proof list by route is printed where necessary adjustments are made for accounts with abrupt increase/decrease in consumption either due to erroneous reading, stop meter, defective meter, unused meter or house connection with no occupant and other similar causes. Accounts with erroneous reading or with issues on the reading, shall be adjusted and subsequently distributed a new bill. Upon receipt of bill, the consumers may now pay their electric bill to any payment centers or outlets.DUE DATE, PENALTY & DISCONNECTION
The Cooperative maintains a policy on the payment of electric bill by the member-consumers. The consumers are encouraged to pay their bills on or before the due date equivalent to 10 days after the receipt of the statement of account. Failure to pay on time results to incurrence of additional charges or even disconnection. General Assembly Resolution No. 2010-02 provides a 3% penalty charge for the late payment of power bills. The General Assembly Resolution No. 2014-01, provides a five-day lapse before the actual conduct of disconnection. A corresponding notice of disconnection is served to the consumers, and within 48 hours after the receipt of the notice, a disconnection of electric service will follow.KNOW YOUR BILL
Your Billing Statement contains the following information:- Account Number
- Account Name
- Meter Serial Number
- Billing Period
- Present and Previous Readings
- Kwhr Consumption
- Basic Rates and Other Charges
- Total Current Bill
- Due Date
- Surcharge after Due Date
- Total Amount after Due Date
- Disconnection Date
A CLOSER LOOK AT THE BILL COMPONENTS
BILECO’s rate is composed of nine components, the Generation Charge, Transmission Charge, System Loss Charge, Distribution Charge, Reinvestment Fund for Sustainable CAPEX, Universal Charge, Lifeline Rate (Discount)/Subsidy, Senior Citizen’s (Discount)/Subsidy and the VAT charges.Said components are further classified into three categories: the Pass through cost, Fix rate and the other cost.
Pass through costs are fees paid to other companies who operate and maintain the electricity network from generation down to transmission. As the name suggests, “any amount billed to the distribution utility shall be passed on to the member-consumers without any additions or reductions”. Said costs primarily drove the fluctuating price of power every month. The two major components of these costs are the generation and transmission charges.
Generation charge covers the cost of power generated and sold to the distribution company by generation companies. This rate shall depend on the source of the power generated (i.e. hydroelectric power, coal, geothermal, etc.). It covers roughly 45% of our monthly power rate which means that any increase or decrease would considerably contribute to the monthly fluctuations. Transmission charge is the cost for the delivery of electricity from generation companies to the electric distribution companies. At present, the operator of the transmission infrastructure is the National Grid Corporation of the Philippines (NGCP).
On the other hand, some of the power rate components does not vary every month otherwise known as “Fix rate”. These rates will not change unless any approval from ERC shall be issued. An example of this rate is BILECO’s Distribution charge, comprised of the distribution, supply and metering charges.
This covers the cost of transporting electricity through the distribution network directly to the end-users. Said cost covers the ECs cost of building, operating and maintaining the distribution system and conveying of power to the customers. Also in the fix rate category is the Reinvestment Fund for Sustainable CAPEX. This cost shoulders the capital projects of the distribution company for the purpose of rehabilitation, upgrading, expansion and the requirement under the provision of Magna Carta for Residential Electricity Consumers.
Universal charge pertains to the cost imposed on all electricity end-users as determined, fixed and approved by the ERC, pursuant to Section 34 of the EPIRA. It is remitted to the Power Sector Assets and Liabilities Management Corporation (PSALM), a government-owned and controlled corporation created by RA 9136. This includes the missionary electrification, environmental charges and REDCI.
The last category of power charges is the Other Charges. The amount of these costs varies every month depending on the base amount like the Value Added Tax-Distribution, Systems Loss Charge, Lifeline (Discount)/Subsidy and the Senior Citizen’s (Discount)/Subsidy.
These combined charges form a Single Stand Rate commonly known as Effective Rate which varies every month.
Categories
Archives
- November 2024
- September 2024
- August 2024
- July 2024
- June 2024
- May 2024
- April 2024
- March 2024
- September 2023
- August 2023
- July 2023
- June 2023
- May 2023
- April 2023
- March 2023
- February 2023
- January 2023
- December 2022
- November 2022
- October 2022
- September 2022
- August 2022
- July 2022
- June 2022
- May 2022
- March 2022
- February 2022
- October 2021
- September 2021
- August 2021
- June 2021
- May 2021
- April 2021
- March 2021
- February 2021
- January 2021
- December 2020
- November 2020
- October 2020
- August 2020
- July 2020
- May 2020
- April 2020
- February 2020
- January 2020
- December 2019
- November 2019
- October 2019
- September 2019
- August 2019
- July 2019
- June 2019
- May 2019
- April 2019
- March 2019
- February 2019
- January 2019
- December 2018
- November 2018
- October 2018
- September 2018
- August 2018
- July 2018
- June 2018
- May 2018
- April 2018
- March 2018
- February 2018
- January 2018
- December 2017
- November 2017
- October 2017
- September 2017
About Us
- Brief HistoryOpens in a new tab
- Vision, Mission & Core ValuesOpens in a new tab
- The Board of DirectorsOpens in a new tab
- The ManagementOpens in a new tab
- Best PracticesOpens in a new tab
Other Links
- Bids and AwardsOpens in a new tab
- DisclosuresOpens in a new tab
- CareersOpens in a new tab
- DownloadsOpens in a new tab
- Contact UsOpens in a new tab
Consumer Services
- Apply for New ConnectionOpens in a new tab
- Billing InformationOpens in a new tab
- Senior Citizen DiscountOpens in a new tab
- Maintenance ScheduleOpens in a new tab
- Power RatesOpens in a new tab