AUGUST 2019 Effective Rates
August 2019 Effective Rates: Residential: P8.7138/kwH Commercial: P7.4504/kwH Public Building: P7.4504/kwH Street Light: P7.4504/kwH Effective…
BILECO emerges National Winner in Dagitab RE Talent Competitions
BILECO’s Gintong Liwanag entries for Song Writing Competition and Kuwentong Dagitab both nailed in the…
BILECO holds General Assembly and Public Consultation on Power Situation in Higatan: 5-Hour Power Supply in the Island surge to 8 hours
Blissful smiles laid in the eyes of the MCOs in Higatangan Island after Engr. Gerardo…
Scheduled Power Interruption in AREA 1 (Naval Area) and AREA 3 (Almeria, Culaba & Kawayan Area)
*Please be advised that a maximum of ELEVEN HOURS (11-HRs) power interruption will be experienced…
JULY 2019 Effective Rates
July 2019 Effective Rates: Residential: P8.5884/kwH Commercial: P7.3845/kwH Public Building: P7.3845/kwH Street Light: P7.3845/kwH Effective…
Scheduled Power Interruption in AREA 1 (Naval Area) Area 2 (Biliran, Cabucgayan & Caibiran Area) and AREA 3 (Almeria, Culaba & Kawayan Area)
*Please be advised that a maximum of TEN HOURS (10-HRs) power interruption will be experienced…
Region 8 emerges champion in lineman rodeo tilt
Invigorating with glory and gory, Region 8 clinched the overall champion of the Lineman Rodeo…
- Go to the previous page
- 1
- …
- 25
- 26
- 27
- 28
- 29
- 30
- 31
- …
- 49
- Go to the next page