JULY 2020 Effective Rates
July 2020 Effective Rates: Residential: P8.2146/kwH Commercial: P7.0675/kwH Public Building: P7.0675/kwH Street Light: P7.0675/kwH Effective…
Towards Total Electrification: Switch-on Ceremony and Formal Energization of Jade Crowne Meadows in Caibiran
CABIBIHAN, CAIBIRAN - Light finally reached to almost 1,000 homes at Jade Crowne Meadows in…
JUNE 2020 Effective Rates
June 2020 Effective Rates: Residential: P8.5206/kwH Commercial: P7.1873/kwH Public Building: P7.1873/kwH Street Light: P7.1873/kwH Effective…
MAY 2020 Effective Rates
May 2020 Effective Rates: Residential: P8.4160/kwH Commercial: P7.2657/kwH Public Building: P7.2657/kwH Street Light: P7.2657/kwH Effective…
Scheduled Power Interruption in AREA 1 (Naval Area), AREA 2 (Biliran, Cabucgayan and Caibiran Area) and AREA 3 (Almeria, Kawayan and Culaba Area)
*Please be advised that a maximum of FOUR HOURS (4-HRs) power interruption will be experienced…
APRIL 2020 Effective Rates
April 2020 Effective Rates: Residential: P8.5943/kwH Commercial: P7.3018/kwH Public Building: P7.3018/kwH Street Light: P7.3018/kwH Effective…
MARCH 2020 Effective Rates
March 2020 Effective Rates: Residential: P9.0807/kwH Commercial: P7.7504/kwH Public Building: P7.7504/kwH Street Light: P7.7504/kwH Effective…
- Go to the previous page
- 1
- …
- 21
- 22
- 23
- 24
- 25
- 26
- 27
- …
- 49
- Go to the next page